margin_ratio · shfe_pb · China mainland (XSGE)

Definition (docs/SCHEMA.md, “Rule names · CFFEX stock-index futures (2026.10.26.6)”): margin_ratio — value: fraction; basis: exchange trading margin as a fraction of contract value, non-hedge (speculative) positions; hedge-position margin is not recorded. Exchange minimum — brokers add their own markup.

Scope shfe_pb: SHFE lead futures (PB), all contract months; Marina coverage from 2024-01-01. margin_ratio = speculative (non-hedge) position margin.

Timeline

marketeffective_fromeffective_tovalueunitverificationpublished_atrecord
XSGE2023-10-092024-02-070.08 (8%)verified2023-09-22cn.futures.margin_ratio.shfe_pb.2023-10-09
XSGE2024-02-072024-02-190.1 (10%)verified2024-02-05cn.futures.margin_ratio.shfe_pb.2024-02-07
XSGE2024-02-192024-04-290.08 (8%)verified2024-02-05cn.futures.margin_ratio.shfe_pb.2024-02-19
XSGE2024-04-292024-05-060.1 (10%)verified2024-04-25cn.futures.margin_ratio.shfe_pb.2024-04-29
XSGE2024-05-062024-07-090.08 (8%)verified2024-04-25cn.futures.margin_ratio.shfe_pb.2024-05-06
XSGE2024-07-092024-09-270.09 (9%)verified2024-07-05cn.futures.margin_ratio.shfe_pb.2024-07-09
XSGE2024-09-272024-10-080.1 (10%)verified2024-09-24cn.futures.margin_ratio.shfe_pb.2024-09-27
XSGE2024-10-082025-01-240.09 (9%)verified2024-09-24cn.futures.margin_ratio.shfe_pb.2024-10-08
XSGE2025-01-242025-02-050.12 (12%)verified2025-01-22cn.futures.margin_ratio.shfe_pb.2025-01-24
XSGE2025-02-052025-04-290.09 (9%)verified2025-01-22cn.futures.margin_ratio.shfe_pb.2025-02-05
XSGE2025-04-292025-05-060.11 (11%)verified2025-04-25cn.futures.margin_ratio.shfe_pb.2025-04-29
XSGE2025-05-062025-09-290.09 (9%)verified2025-04-25cn.futures.margin_ratio.shfe_pb.2025-05-06
XSGE2025-09-292025-10-090.11 (11%)verified2025-09-24cn.futures.margin_ratio.shfe_pb.2025-09-29
XSGE2025-10-092026-01-270.09 (9%)verified2025-09-24cn.futures.margin_ratio.shfe_pb.2025-10-09
XSGE2026-01-272026-01-300.1 (10%)verified2026-01-23cn.futures.margin_ratio.shfe_pb.2026-01-27
XSGE2026-01-302026-02-090.11 (11%)verified2026-01-28cn.futures.margin_ratio.shfe_pb.2026-01-30
XSGE2026-02-092026-02-120.12 (12%)verified2026-02-05cn.futures.margin_ratio.shfe_pb.2026-02-09
XSGE2026-02-122026-02-240.15 (15%)verified2026-02-09cn.futures.margin_ratio.shfe_pb.2026-02-12
XSGE2026-02-242026-03-170.12 (12%)verified2026-02-09cn.futures.margin_ratio.shfe_pb.2026-02-24
XSGE2026-04-292026-05-060.12 (12%)verified2026-04-27cn.futures.margin_ratio.shfe_pb.2026-04-29
XSGE2026-09-292026-10-080.11 (11%)verified2026-09-21cn.futures.margin_ratio.shfe_pb.2026-09-29

Records and sources

cn.futures.margin_ratio.shfe_pb.2023-10-09

market
XSGE
interval
[2023-10-09, 2024-02-07)
value
0.08 (8%)
verification
verified
published_at
2023-09-22
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The notice makes the restoration conditional (first trading day after the holiday without a one-sided market); the date is fixed from the settlement-parameter file.

cn.futures.margin_ratio.shfe_pb.2024-02-07

market
XSGE
interval
[2024-02-07, 2024-02-19)
value
0.1 (10%)
verification
verified
published_at
2024-02-05
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels.

cn.futures.margin_ratio.shfe_pb.2024-02-19

market
XSGE
interval
[2024-02-19, 2024-04-29)
value
0.08 (8%)
verification
verified
published_at
2024-02-05
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The notice makes the restoration conditional (first trading day after the holiday without a one-sided market); the date is fixed from the settlement-parameter file.

cn.futures.margin_ratio.shfe_pb.2024-04-29

market
XSGE
interval
[2024-04-29, 2024-05-06)
value
0.1 (10%)
verification
verified
published_at
2024-04-25
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels.

cn.futures.margin_ratio.shfe_pb.2024-05-06

market
XSGE
interval
[2024-05-06, 2024-07-09)
value
0.08 (8%)
verification
verified
published_at
2024-04-25
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The notice makes the restoration conditional (first trading day after the holiday without a one-sided market); the date is fixed from the settlement-parameter file.

cn.futures.margin_ratio.shfe_pb.2024-07-09

market
XSGE
interval
[2024-07-09, 2024-09-27)
value
0.09 (9%)
verification
verified
published_at
2024-07-05
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels.

cn.futures.margin_ratio.shfe_pb.2024-09-27

market
XSGE
interval
[2024-09-27, 2024-10-08)
value
0.1 (10%)
verification
verified
published_at
2024-09-24
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels.

cn.futures.margin_ratio.shfe_pb.2024-10-08

market
XSGE
interval
[2024-10-08, 2025-01-24)
value
0.09 (9%)
verification
verified
published_at
2024-09-24
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The notice makes the restoration conditional (first trading day after the holiday without a one-sided market); the date is fixed from the settlement-parameter file.

cn.futures.margin_ratio.shfe_pb.2025-01-24

market
XSGE
interval
[2025-01-24, 2025-02-05)
value
0.12 (12%)
verification
verified
published_at
2025-01-22
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels.

cn.futures.margin_ratio.shfe_pb.2025-02-05

market
XSGE
interval
[2025-02-05, 2025-04-29)
value
0.09 (9%)
verification
verified
published_at
2025-01-22
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The notice makes the restoration conditional (first trading day after the holiday without a one-sided market); the date is fixed from the settlement-parameter file.

cn.futures.margin_ratio.shfe_pb.2025-04-29

market
XSGE
interval
[2025-04-29, 2025-05-06)
value
0.11 (11%)
verification
verified
published_at
2025-04-25
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels.

cn.futures.margin_ratio.shfe_pb.2025-05-06

market
XSGE
interval
[2025-05-06, 2025-09-29)
value
0.09 (9%)
verification
verified
published_at
2025-04-25
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The notice makes the restoration conditional (first trading day after the holiday without a one-sided market); the date is fixed from the settlement-parameter file.

cn.futures.margin_ratio.shfe_pb.2025-09-29

market
XSGE
interval
[2025-09-29, 2025-10-09)
value
0.11 (11%)
verification
verified
published_at
2025-09-24
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels.

cn.futures.margin_ratio.shfe_pb.2025-10-09

market
XSGE
interval
[2025-10-09, 2026-01-27)
value
0.09 (9%)
verification
verified
published_at
2025-09-24
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The notice makes the restoration conditional (first trading day after the holiday without a one-sided market); the date is fixed from the settlement-parameter file.

cn.futures.margin_ratio.shfe_pb.2026-01-27

market
XSGE
interval
[2026-01-27, 2026-01-30)
value
0.1 (10%)
verification
verified
published_at
2026-01-23
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The 2026 adjustment notices apply to contracts already listed (已上市合约); contracts listed later carry their own levels (see the known gap that starts when they diverge).

cn.futures.margin_ratio.shfe_pb.2026-01-30

market
XSGE
interval
[2026-01-30, 2026-02-09)
value
0.11 (11%)
verification
verified
published_at
2026-01-28
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The 2026 adjustment notices apply to contracts already listed (已上市合约); contracts listed later carry their own levels (see the known gap that starts when they diverge).

cn.futures.margin_ratio.shfe_pb.2026-02-09

market
XSGE
interval
[2026-02-09, 2026-02-12)
value
0.12 (12%)
verification
verified
published_at
2026-02-05
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The 2026 adjustment notices apply to contracts already listed (已上市合约); contracts listed later carry their own levels (see the known gap that starts when they diverge).

cn.futures.margin_ratio.shfe_pb.2026-02-12

market
XSGE
interval
[2026-02-12, 2026-02-24)
value
0.15 (15%)
verification
verified
published_at
2026-02-09
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The 2026 adjustment notices apply to contracts already listed (已上市合约); contracts listed later carry their own levels (see the known gap that starts when they diverge).

cn.futures.margin_ratio.shfe_pb.2026-02-24

market
XSGE
interval
[2026-02-24, 2026-03-17)
value
0.12 (12%)
verification
verified
published_at
2026-02-09
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The notice makes the restoration conditional (first trading day after the holiday without a one-sided market); the date is fixed from the settlement-parameter file. The 2026 adjustment notices apply to contracts already listed (已上市合约); contracts listed later carry their own levels (see the known gap that starts when they diverge).

cn.futures.margin_ratio.shfe_pb.2026-04-29

market
XSGE
interval
[2026-04-29, 2026-05-06)
value
0.12 (12%)
verification
verified
published_at
2026-04-27
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The Labor Day 2026 notice names only the contracts listed in March and April 2026; the earlier contracts were already at this level, so every contract carries the value on these days (checked in the settlement-parameter files).

cn.futures.margin_ratio.shfe_pb.2026-09-29

market
XSGE
interval
[2026-09-29, 2026-10-08)
value
0.11 (11%)
verification
verified
published_at
2026-09-21
recorded_at
2026-11-03
data file
cn/shfe_futures.yaml

Notes: Exchange speculative (一般持仓 / 投机) trading margin as a fraction of contract value for general contract months: the minimum SPECLONGMARGINRATIO over the product's contracts in the daily settlement-parameter file, excluding contracts under a one-sided-market increase that day. Brokers add their own markup. Contract-level increases near delivery (month before delivery, delivery month, last days) follow the product rules and are not encoded; nor are one-sided-market increases under the risk-control rules (风险控制管理办法), which the holiday and adjustment notices say are applied on top of the stated levels. The 2026 adjustment notices apply to contracts already listed (已上市合约); contracts listed later carry their own levels (see the known gap that starts when they diverge).

Known gaps

gapmarketrulefromtoseveritystatuscontractsreason
G-0049XSGEmargin_ratio2026-03-172026-04-29mediumopenGeneral-month contracts carry different values that are not explained by delivery proximity, listing day or one-sided markets: the 2026 adjustment notices raised contracts already listed (已上市合约) while contracts listed from March/April 2026 came in at lower levels. No single product-level value exists. Queries inside the interval raise KeyError (OUT_OF_COVERAGE in resolve()).
G-0050XSGEmargin_ratio2026-05-062026-09-29mediumopenGeneral-month contracts carry different values that are not explained by delivery proximity, listing day or one-sided markets: the 2026 adjustment notices raised contracts already listed (已上市合约) while contracts listed from March/April 2026 came in at lower levels. No single product-level value exists. Queries inside the interval raise KeyError (OUT_OF_COVERAGE in resolve()).
G-0051XSGEmargin_ratio2026-10-08openmediumopenGeneral-month contracts carry different values that are not explained by delivery proximity, listing day or one-sided markets: the 2026 adjustment notices raised contracts already listed (已上市合约) while contracts listed from March/April 2026 came in at lower levels. No single product-level value exists. Queries inside the interval raise KeyError (OUT_OF_COVERAGE in resolve()).

Tracking

markettracked_through
XSGE2026-11-02

For a date on or before tracked_through, an open-ended record (effective_to: null) states what the sources said on that date. For a later date it is a carry-forward of the last checked rule, not a finding. A closed record is unaffected: its effective_to is itself sourced. A market or scope with no entry is untracked — no date is defaulted, and every open-ended answer on it is a carry-forward. (docs/SCHEMA.md, “Tracking registry”)

Ask it yourself

pip install marina-rules

import marina_rules as mr
mr.rule_at("margin_ratio", "2026-09-29", "shfe_pb", "XSGE")

marina-rules query margin_ratio 2026-09-29 shfe_pb XSGE

Cite

rules: marina-rules@2026.11.16 sha256:80188ec249ce22ae

Generated from the data of marina-rules 2026.11.16. Same facts as text: margin_ratio.md. Treat the exchange's own notice as authoritative.

marina-rules — point-in-time trading rules as data. Install from PyPI · source, data and how to cite · CC0 data, MIT code.